Your browser does not support javascript

News

KLM: TSX-V
$0.02

News

Nov 23, 2007

Kermode Releases Phase 4 Drill Results and a Drill Summary from Previous Drilling at Jackson's Arm, Newfoundland Gold Project

Kermode Resources is pleased to announce drill results from Phase 4 of its drill program at Jackson's Arm, Newfoundland. Kermode is now completing a drill hole database compilation in order to plan further drilling and to ascertain the potential for a resource evaluation based on drilling completed to date. Drilling in Phase 4 consisted of 82 holes drilled totaling 12,608 metres.

Results from the Road Zone of the property are as follows:

Hole Number

From (m)

To (m)

Core Length (m)

Au (gpt)

 

 

 

 

 

JA-07-113

21.5

30.5

9.0

0.83

 

72.2

78.5

6.3

0.88

 

104.0

107.0

3.0

0.71

JA-07-114

52.0

58.3

6.3

1.50

JA-07-115

21.0

22.0

1.0

1.62

 

24.1

29.1

5.0

1.35

 

32.2

33.2

1.0

1.46

JA-07-116

15.1

17.1

2.0

1.04

 

26.4

31.3

4.9

0.76

 

47.2

48.2

1.0

1.44

JA-07-117

27.5

30.6

3.1

1.43

JA-07-118

252.0

253.0

1.0

1.23

JA-07-119

158.0

164.0

6.0

0.71

 

198.9

200.4

1.5

1.22

 

252.5

258.5

6.0

0.81

JA-07-120

Abandoned

 

 

NSR

JA-07-121

197.4

224.0

26.6

0.95

 

253.2

254.5

1.3

3.15

JA-07-122

69.6

81.5

11.9

1.50

Includes

69.6

70.4

0.8

7.93

 

99.5

104.0

4.5

0.98

 

117.6

120.1

2.5

1.41

 

181.7

183.3

1.6

1.26

JA-07-123

65.0

84.5

19.5

0.78

 

99.0

100.0

1.0

1.43

 

152.0

158.9

6.9

0.90

 

166.8

170.0

3.2

1.14



Highlights of previously reported results produced during drilling at Jackson's Arm include:

Apsy Zone

Hole Number

From (m)

To (m)

Core Length (m)

Au (gpt)

 

 

 

 

 

JA-06-46

10.5

108.4

91.2

1.36

JA-06-49

163.3

187.1

23.9

1.48

JA-06-52

3.5

32.0

28.5

1.13

JA-06-53

5.0

76.6

71.6

1.32

JA-06-54

1.2

86.5

85.3

1.03



Road Zone

Hole Number

From (m)

To (m)

Core Length (m)

Au (gpt)

 

 

 

 

 

JA-07-69

12.5

35.0

23.0

1.02

JA-07-70

39.0

71.0

32.0

1.30

JA-07-71

36.3

63.6

27.3

1.12

JA-07-72

37.4

88.2

50.8

1.27

JA-07-73

17.0

81.9

64.9

1.02

JA-07-74

71.8

93.0

21.2

1.06

JA-07-75

53.0

94.5

41.5

1.07

JA-07-77

11.0

31.5

20.5

1.42

 

53.0

76.0

23.0

1.52

JA-07-78

17.0

42.5

25.5

1.21

 

89.7

133.5

43.8

1.00

JA-07-79

52.1

79.5

24.7

1.15

JA-07-80

24.3

89.0

64.7

1.04




Kermode acknowledges the financial assistance provided by the Government of Newfoundland and Labrador's Junior Company Exploration Assistance Program. Proceeds of a flow-through financing by MineralFields Group of Toronto (www.mineralfields.com) are being used to fund this drill program.

Kermode has granted 530,000 stock options at $ 0.15 per share to Directors, Officers and Consultants of the Company.

Visit our website at www.kermode.com for more information.

ON BEHALF OF THE BOARD OF DIRECTORS
"D. Neil Briggs"
PRESIDENT and DIRECTOR

Consulting Geologist James Harris P.Geo, a Qualified Person under National Instrument 43-101 guidelines, is supervising the Jackson's Arm drilling program and has reviewed the technical information contained in this News Release on behalf of the Company. Petro Drilling Company Limited of Springdale, Newfoundland is conducting the drilling. Core samples were taken from drillcore which was descriptively logged on site, aligned, marked for sampling and then split in half, longitudinally, using a diamond saw blade. One half the core has been preserved in core boxes for future reference. The samples, comprising the other half of the drillcore were bagged, sealed and delivered directly to the analytical laboratory under the supervision of Mr. Harris. Samples were processed and analyzed at Eastern Analytical Ltd., an assay laboratory based in Springdale, Newfoundland. Samples were crushed with a jaw crusher to 75% passing 10 mesh and split with a riffle splitter to approximately 250 grams. This sample was then pulverized to 95% passing 150 mesh and analyzed for gold utilizing a half assay ton, fire assay technique plus ICP 11. As part of the quality control program being implemented, Eastern Analytical is sending a pulp of 1 in 10 samples to Acme Analytical Laboratories Ltd. of Vancouver BC, an ISO 9001:2000 accredited laboratory for ICPMS check analyses. Analytical pulps and rejects will be retrieved by Kermode and retained.

No Stock Exchange Has Approved or Disapproved The Information Contained Herein