Mr. Adrian O'Brien reports:
Kermode announces that the Buzz Lake Drill Program announced December 18, 2012 has been completed. This drill program was designed to test an 850 metre long geophysical target, originally drilled by Hudson's Bay Exploration and Development in 1985.
Kermode tested the structure along strike, with a total of 905 metres of drilling. Assays reported anomalous gold but no economically significant values.
No further work is planned at Buzz Lake.
Further information is available at
www.kermode.com
ON BEHALF OF THE BOARD
"Adrian O'Brien"
ADRIAN O'BRIEN
PRESIDENT and DIRECTOR
Forward-Looking Statements: This Kermode Resources Ltd. news release may contain certain "forward-looking" statements and information relating to Kermode which are based on the beliefs of Kermode management, as well as assumptions made by and information currently available to Kermode management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more of these risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein.